力、扭矩和功率

计算端面铣的切向力、扭矩、以及加工功率。

邮寄地址

Conversion of Workpiece Material Rockwell (Optional)
Metric
Inch

Conversion of Workpiece Material Rockwell (Optional)

Skip this step if you already know the Brinell hardness number(HB)
Characteristics of Workpiece Materials

Characteristics of Workpiece Materials

HB
PSI N/mm 2
Ultimate Strength shown for generic steel. Please enter the actual value of your workpiece material if available&#44 for better accuracy You may look up this info through websites such as www.matweb.com
Face Mill Nomenclature

Face Mill Nomenclature

inmm
Machining Conditions

Machining Conditions

(SFM)m/min
in (DOC)mm (DOC)
in (WOC)mm (WOC)
in. (IPT) (chip load)mm
Most Common
Workpiece Materials
W/D  ratios:
W/D < = 0.660.66 < W/D < 1.0W/D = 1.0
Aluminum alloys1.01.051.1
Carbon and alloy steels1.01.151.3
Cast irons1.01.151.3
Titanium alloys1.01.201.4
Stainless steel&#44 High-temperature alloys2.02.152.3
Direct Belt Drive.9
Back Gear Drive.75
Geared Head Drive.7-.8
Oil - Hydraulic Drive.6-.9
Calculated Machining Conditions

Calculated Machining Conditions

rpm
(IPM) (no productivity formula)mm/min (no productivity formula)
in. (chip load at the cut)mm (no productivity formula)
(IPM) (with productivity formula)mm/min (with productivity formula)
(MRR) (no productivity formula)cm3/min (no productivity formula)
(MRR) (with productivity formula)cm3/min (with productivity formula)
in.2mm2
Calculated Required Power

Calculated Required Power

lbN
Nm  in.-lb  ft-lbNmm
Machining Power

Machining Power

(HPc)KW
hpKW
您即将把 添加至“我的解决方案”页面. 是否要继续?
Select the destination where you want to move 到.
最新 Folder
    • Applied Filters:
    • Clear All

product-image
Please adjust the following properties from

ISO Catalog

ANSI Catalog

to find similar products.

The following files are available

Please select a file to download

Models

Product data

应记录以查看仪表盘信息
Session expired due to inactivity, please login again
您尝试添加到购物车的产品 () 不可用,请 联系客户服务部。
件物品已成功添加到购物车
View Cart

. Please enter the desired qty for the material(s) you want to include in your promotion or Proceed Without Promotion and only your base materials will be added to the cart.

Minimum quantity should be

SAP Material NumberISO CatalogGrade  

You are about to leave the Solution building process.

Are you sure you want to leave?