Product Similar To: [Product Name]

Back To [Product] | Modify Similar To

Sending to {{cadTool}} in progress...

Downloaded file will be available after import in the {{cadTool}} tool library.

NPT/ANPT and NPTF High-Hook Production Taper Pipe Taps
NPT/ANPT and NPTF High-Hook Production Taper Pipe Taps
NPT/ANPT and NPTF High-Hook Production Taper Pipe Taps
NPT/ANPT and NPTF High-Hook Production Taper Pipe Taps
NPT/ANPT and NPTF High-Hook Production Taper Pipe Taps
NPT/ANPT and NPTF High-Hook Production Taper Pipe Taps

Series 5820 • Standard Pipe Chamfer • Standard Projection • NPT/ANPT, NPTF High Hook

NPT/ANPT and NPTF High-Hook Production Taper Pipe Taps

Features and benefits

Features and Benefits:
  • Manufactured from select high-speed steel.

  • Ground thread pipe taps are standard in American Standard Pipe Form (NPT) and American Standard Dryseal Pipe Thread Form (NPTF).

  • NPT threads require the use of a sealer, such as Teflon® tape or pipe compound.

  • NPTF dryseal threads give a pressure-tight joint without the use of a sealer.

  • Uncoated taps standard; coatings available as specials.

  • Hook designed for use in ductile materials that produce long, continuous chips.

Uses and application

  • Tapping: Pipe ThreadTapping: Pipe Thread
  • 3849038490
  • 3854138541
  • 3854338543
  • Flood Coolant: TappingFlood Coolant: Tapping
You are about to add to your My Solutions page. Do you want to proceed?
Select the destination where you want to move to.
New Folder
    • Applied Filters:
    • Clear All

product-image
Please adjust the following properties from

ISO Catalog Number

ANSI Catalog Number

to find similar products.

The following files are available

Please select a file to download

Models

You should be logged to see your dashboard information
Session expired due to inactivity, please login again
The product/s () you were trying to add to the cart is/are not available, please contact customer service
item(s) successfully added to the cart
View Cart

. Please enter the desired qty for the material(s) you want to include in your promotion or Proceed Without Promotion and only your base materials will be added to the cart.

Minimum quantity should be

SAP Material NumberISO Catalog NumberGrade  

You are about to leave the Solution building process.

Are you sure you want to leave?