Product Similar To: [Product Name]

Back To [Product] | Modify Similar To

Sending to {{cadTool}} in progress...

Downloaded file will be available after import in the {{cadTool}} tool library.

NPT/ANPT and NPTF Production Taper Pipe Taps with Interrupted Threads
NPT/ANPT and NPTF Production Taper Pipe Taps with Interrupted Threads
NPT/ANPT and NPTF Production Taper Pipe Taps with Interrupted Threads
NPT/ANPT and NPTF Production Taper Pipe Taps with Interrupted Threads
NPT/ANPT and NPTF Production Taper Pipe Taps with Interrupted Threads
NPT/ANPT and NPTF Production Taper Pipe Taps with Interrupted Threads

Series 5319 • Standard Pipe Chamfer • Standard Projection • NPT/ANPT, NPTF Interrupted

NPT/ANPT and NPTF Production Taper Pipe Taps with Interrupted Threads

Features and benefits

Features and Benefits:
  • Manufactured from select high-speed steel.

  • Interrupted threads to reduce drag while taper pipe threading.

  • Use where chip disposal is a concern.

  • Odd number of flutes standard.

  • NPT threads require the use of a sealer, such as Teflon® tape or pipe compound.

  • NPTF dryseal threads give a pressure-tight joint without the use of a sealer.

Uses and application

  • Tapping: Pipe ThreadTapping: Pipe Thread
  • Manufacturer’s Specs: ANSI UNFManufacturer’s Specs: ANSI UNF
  • 3849038490
  • 3854338543
  • Flood Coolant: TappingFlood Coolant: Tapping
You are about to add to your My Solutions page. Do you want to proceed?
Select the destination where you want to move to.
New Folder
    • Applied Filters:
    • Clear All

product-image
Please adjust the following properties from

ISO Catalog Number

ANSI Catalog Number

to find similar products.

The following files are available

Please select a file to download

Models

You should be logged to see your dashboard information
Session expired due to inactivity, please login again
The product/s () you were trying to add to the cart is/are not available, please contact customer service
item(s) successfully added to the cart
View Cart

. Please enter the desired qty for the material(s) you want to include in your promotion or Proceed Without Promotion and only your base materials will be added to the cart.

Minimum quantity should be

SAP Material NumberISO Catalog NumberGrade  

You are about to leave the Solution building process.

Are you sure you want to leave?